PUBLIC REQUEST FOR PROPOSALS (RFP)
Title: Space City Infrastructure Vault Phase 1 — Public Utility Excavation, Conversion & Dedication (3 Acres, 100’ Deep)
Soliciting Entity: Horizontal Land Partners (Sponsorship Team for Space City Platform)
Location: Central Volusia County, Florida
Legal Basis: Florida Statutes §§ 287.057, 255.065, 125.01055; FEMA, USDA, EPA, ERP-Exempt Excavation
Proposal Type: Joint Venture / Heavy Civil Costing Partner / Public Dedication Structuring Team
1. CRITICAL INFRASTRUCTURE PROBLEM STATEMENT
This RFP responds to a compounding crisis in the Blue Spring Priority Focus Area (PFA) of Volusia County:
-
70%+ of households remain on septic systems, despite nitrogen-impaired watershed designations.
-
There is no modern stormwater, sewer, or reclaimed water infrastructure across most of Deltona.
-
The City of Deltona is subject to a federal class action lawsuit (Stone Island v. Deltona) related to mismanaged post-hurricane drainage.
-
Repeated FEMA-declared flood events have occurred in the area, with worsening stormwater conditions.
Despite these conditions, the city and county continue to approve septic permits. We seek to deliver a federally owned and dedicated infrastructure solution, not a vertical or speculative real estate project.
2. RFP PURPOSE & STRUCTURE
This RFP invites proposals from federally aligned civil contractors, joint venture partners, or infrastructure aggregators to:
-
Deliver a 3-acre, 100-foot deep critical civic infrastructure vault
===== Page 2 =====
-
Convert ERP-exempt excavation into stormwater culverts and poured concrete systems
-
Support a 44-acre platform with future expansion
-
Structure the public dedication to FEMA, USDA, EPA, or the State of Florida
-
Publish and coordinate with MyFloridaMarketPlace, DemandStar, and federal procurement channels
This is Phase 1 of a larger infrastructure modernization platform, beginning with excavation and stormwater systems—not speculative vertical development.
3. INFRASTRUCTURE LAYOUT (BY LEVEL)
Level | Function | Notes |
---|---|---|
B6 | Water storage (reclaimed/potable) | 40 MG capacity (redundant) |
B5 | Wastewater treatment | 20 MGD nitrogen-compliant systems |
B4 | Stormwater detention & culvert intake | FEMA-aligned 50 acre-feet detention |
B3 | Power systems | Battery vaults, switchgear (200 MW capacity) |
B2 | Public garage (EV-enabled) | 20–30% of total parking below grade |
B1 | Public garage + emergency corridor | Drone + lift access included |
L1 | Civic plaza (to be turned over to County) | Public realm design by County discretion |
L2-L4 | Parking decks (25,000–30,000 spaces) | For public, civic, hospital, and housing support |
L5+ | Vertical development (not included in this RFP) | Reserved for future housing/hospital/civic towers |
Comparable precedent: This structure mirrors the stratified substructure logic used in Hudson Yards (NYC) and Rockefeller Center, where public infrastructure forms the foundation of multi-phase vertical districts. However, unlike those models, Space City Phase 1 is designed for public dedication and FEMA-first execution.
4. INFRASTRUCTURE DESIGN CAPACITY (100,000 PEOPLE)
System | Volume | Notes |
---|---|---|
Potable + Reclaimed Water | 600,000 cu ft | 6 cu ft per person |
Wastewater | 1,000,000 cu ft | 20 MGD capacity |
Stormwater Detention | 1,000,000 cu ft | FEMA-grade, oversized by 30% |
Power + Storage | 800,000 cu ft | All-electric design platform |
Fire + Emergency + Solid Waste | 500,000 cu ft | Vault-based contingency |
Broadband, Fiber, Redundancy | 1,000,000 cu ft | Regional core backup |
Total Built Volume | ~13M cu ft | Supports 200,000+ with redundancy |
5. ORGANIZATIONAL FILINGS & LEGAL STRUCTURE
This RFP is supported by the following statutory filings and federal coordination efforts:
-
FAA Superstructure Submission – 2,998’ vertical tower (May 2025)
-
ERP Exemption – For full excavation and culvert conversion (submitted)
-
CDD Petition – Under F.S. 190 (submitted May 15, 2025)
-
Live Local Act MPUD Petition – Under F.S. 125.01055 (City + County)
-
Municipal Contraction Petition – Under F.S. 171.051
-
CRA Overlay Application – Voluntary application pending
-
Federal Emergency Infrastructure Petition – Pending FEMA designation
-
Volusia County Legal Filings – Full docket submitted under Space City Platform umbrella
-
All supporting documents, filings, and statutory exhibits available upon request.
-
STRUCTURE OVERVIEW: ONE PLATFORM, MULTIPLE TOWERS
Element | Function | Ownership | Notes |
---|---|---|---|
Below-grade vault (B6–B1) | Public utilities: water, sewer, storm, fiber, fire, power | State/Federal (via USDA/FEMA/EPA/DEP) | Requires vault-scale excavation and redundant FEMA compliance (Class IV or better) |
Public garage (6–8 levels) | 25,000–30,000 EV parking spaces | Public or developer-owned with public easement | FEMA-eligible; bonded for ADA, EV, and civil utility redundancy |
Transit deck + podium layer (0–20′) | Access, logistics, civic entry points | County/public ROW or easement | Supports elevated staging, emergency turnaround, drone and fire access |
Tower A: Hospital Megastructure (~2M SF) | Hospital, medical research, biotech hub | Owned by Hospital System / Healthcare REIT | Eligible for HUD 242 mortgage insurance |
Tower B & C: Residential Superstructures (~12,000 units) | Mixed-income housing, deed-restricted Live Local Act | Owned by developer or BTR/SPVs | Each SPV can be bonded/sold/refinanced independently |
Retail Podium + Sky Plazas (~21.5M SF total GFA) | Shopping, commercial, entertainment, civic use | Developer-owned air rights | Requires staging slab, vertical egress design, FAA confirmation |
LEGAL STRUCTURE: AIR RIGHTS + SEPARATE OWNERSHIP + SHARED EASEMENTS
Layer Legal Tool Notes
Utilities Public deed or joint title (State + Federal) Guarantees zoning immunity, FEMA/USDA eligibility, and WIFIA compliance; supports state/federal bonding overlays
Garage Public garage with shared use easement Reimbursable through CRA; available for leaseback or capex recovery through infrastructure trust model
Transit Deck Public ROW dedication or easement (0–20′) Designed for permanent access with cross-platform utility connections; interagency staging supported
Towers Vertical subdivision + SPV assignments Condo or air-rights plat allows for separate equity financing and sale of towers A, B, C; allows cross-collateralization for HUD, LIHTC, or REIT investments
Retail / Podium Developer-control led podium GFA Eligible for commercial REIT partnership, TIF-style air-rights transfer, or long-term civic leaseback
HOUSING & FINANCE COMPLIANCE (LIVE LOCAL + AGENCY CAPS)
Category
Detail
Housing Units
~12,000 units (Phase I + II)
Affordability
≥40% of units deed-restricted at ≤120% AMI for 30+ years (Live Local Act)
Commercial GFA in Residential Towers
≤20% (per Fannie Mae / Freddie Mac underwriting caps)
Rental/Sale SPVs
Each tower structured as its own SPV for separate sale, financing, or disposition; allows for GSE or FHA modular capital stack
HOSPITAL TOWER STRATEGY
Feature
Approach
Ownership
Fee simple or long-term leaseback to hospital operator, health REIT, or county health district
Financing
Developer constructs shell/core; interior buildout via HUD Section 242, NMTC, or direct credit facility
Program
~2M SF for surgical, acute, workforce medical, and research spaces
Integration Direct elevator access from vault, fire-compliant bridge connections,
podium-level EMS routing
Public Benefit May qualify for tax-exempt bond treatment; supports regional FEMA hazard
mitigation goals (healthcare access during disaster)
DELIVERY + BONDING FRAMEWORK
-
All public utility systems to be bonded through state or federal procurement trust models
-
FEMA-recognized vault specifications required for detention, fire, and emergency lift infrastructure
-
Excavation and poured concrete culvert conversion budgeted at $1.2B in total materials value over multi-phase scope
-
Batch plants and culvert vault assembly to occur on-site under ERP exemption
-
Full delivery to be phased, with SPV structuring, cost segregation, and trust accounting models provided to qualified respondents upon RFP acceptance
This section positions the platform for long-term public integration, FEMA redundancy, and federally backed infrastructure securitization. Respondents with bonding authority, excavation equipment, or engineering procurement construction (EPC) teams will be prioritized for negotiation.
Full financial model and capital stack options available upon NDA request.
6. FUNDING + GRANT ALIGNMENT
This project is eligible under the following programs:
-
FEMA BRIC (Building Resilient Infrastructure and Communities)
-
USDA RUS (Water & Waste Disposal Loan and Grant Program)
-
EPA WIFIA (Water Infrastructure Finance and Innovation Act)
-
CRA Reimbursement (if applicable post-dedication)
-
Potential export credit support (for culvert systems used by federal partners in South America)
We are NOT proposing speculative resale. All excavated material is to be used for:
-
On-site vaults and detention systems
-
FEMA-rated culvert networks
-
Regional public stormwater retrofits
-
Precast or poured systems distributed to counties or federal partners
7. WHO SHOULD RESPOND
We seek a federally capable joint venture partner or public infrastructure firm who can:
-
Lead costing, packaging, and publication of the project
-
Coordinate concrete production, batch plants, culvert design, and excavation
-
Structure joint venture or P3 for public dedication
-
Work directly with zoning attorneys and federal agencies
Ideal respondents:
-
Mining companies with civic batching capacity
-
Precast concrete manufacturers (e.g., Oldcastle, CEMEX, Forterra)
-
Civil infrastructure contractors with >$50M past project delivery
-
SAM.gov–registered contractors with FEMA, USDA, or EPA project history
8. SUBMISSION INSTRUCTIONS
Email To: rob@pink-construction.com and call 614-400-8762 for further information
Subject: “Space City Infrastructure Vault Phase 1 – JV Proposal”
Deadline: July 15, 2025
Please include:
-
Firm/Team Introduction
-
Relevant federal or state project history
-
JV or structuring model proposed
-
Bonding limits
-
Public costing methodology or preliminary estimate plan
-
SAM.gov identifiers (if available)
-
Optional: Vendor ID for MyFloridaMarketPlace
9. SPONSORSHIP + NEXT STEPS
Horizontal Land Partners is the sponsor and master coordination lead of the Space City Platform. We are currently:
-
Working with zoning and federal attorneys on Live Local Act and public utility dedication
-
Finalizing FAA coordination and excavation logistics
-
Seeking a qualified infrastructure or mining JV partner who can execute Phase 1 with urgency
This is the first federally dedicated civic vault platform of its kind in Florida. If your organization builds culverts, mines sand, delivers FEMA-grade infrastructure, or wants to lead the next wave of public vaulting—we are ready to move.
ONE-PAGE RFP SUMMARY + EVALUATION CRITERIA
Project Name:
Space City Infrastructure Vault Phase 1
Civic excavation and public infrastructure platform supporting regional FEMA stormwater, wastewater, and emergency response systems, with direct material conversion via ERP-exempt excavation.
Scope Includes:
-
3-acre vault excavation and concrete culvert system
-
FEMA-compliant fire, sewer, power, and stormwater vaults
-
ERP-exempt on-site concrete manufacturing
-
Joint venture structuring and federal submission coordination
-
Public ROW + garage integration, excluding superstructure development
Proposal Submission Deadline:
July 15, 2025 — 5:00 PM ET
Submit to: rob@pink-construction.com and 614-400-8762
Subject Line: “Space City Infrastructure Vault – RFP Submission”
Evaluation Criteria:
Category | Weight |
---|---|
Technical qualifications and relevant project history | 30% |
Federal procurement experience + bonding capacity | 25% |
Excavation, concrete, or culvert manufacturing capability | 20% |
SAM.gov or MyFloridaMarketPlace publication readiness | 15% |
Costing methodology and JV structuring proposal | 10% |
Required Submission Contents:
-
Cover letter and expression of interest
-
Team qualifications + federal identifiers (SAM.gov, DUNS, CAGE)
-
Technical scope proposal and delivery model
-
Public costing or bond strategy
-
Summary of relevant public infrastructure projects over $50M
All qualifying teams will be eligible for access to FAA filings, ERP exemption, excavation diagrams, and zoning-level infrastructure overlays under NDA.